Formwork can be made out of timber, plywood, steel, precast concrete or fibre glass used separately or in combination. Steel forms are used in situation where large numbers of re-use of the same forms are necessary. For small works, timber formwork proves useful.

What are types of formwork?

Types of Formwork in Construction

  • Timber Formwork.
  • Steel Formwork.
  • Aluminum Formwork.
  • Plywood Formwork.
  • Fabric Formwork.
  • Plastic Formwork.

What tools and equipment are commonly used for constructing formwork?

14 Products in Formwork Tools

  • Ideal Tie Wire Reel Formwork Tools.
  • Tie Wire Roll Tie Wire.
  • Ideal Leather Work Belt Formwork Tools.
  • Leather Reel Pad Formwork Tools.
  • End Cutting Nippers Formwork Tools.
  • High Leverage Concreters’ Nippers Formwork Tools.
  • Leather Nip Holder Formwork Tools.
  • Steel Nip Holder Formwork Tools.

Which formwork is best?

Plastic formwork works best in small projects consisting on repetitive tasks, such as low-cost housing estates. Plastic formwork is light and can be cleaned with water, while being suitable for large sections and multiple reuses.

How is beam formwork calculated?

  1. Take the cross-section of beam and measure the lengths of the two sides and base of beam.
  2. Sum the three measurements.
  3. Measure the span of the beam.
  4. Multiply the span length by sum of the three measurements (beam base two vertical sides) gives the shuttering area of beam.

How is formwork calculated?

The formwork is measured in terms of area that is in contact with the concrete surface. For example, the formwork for concrete footing will be calculated as the surface area of four sides of foundation only. Bottom of the footing is resting on earth, there is no need of any formwork and top of footing is open.

What is Backpropping?

Back propping refers to the addition of propping support to reinforce an existing suspended floor system. It provides an alternative load path through the superstructure to ensure the existing or as built permanent elements are not overloaded given the imposed load.

What is the order of for removing formwork List 3 steps in the correct order?

Step 1: Wait for the concrete to set. Wait the required time for the concrete to harden and gain enough strength to support itself.

  • Step 2: Start from the top. Remove the highest forms first.
  • Step 3: Remove the stakes.
  • Step 4: Remove the sides.
  • Step 5: Recycle or dispose of formwork.
  • What is another word for shuttering?

    What is another word for shuttering?

    screening covering
    cloaking shading
    sheltering camouflaging