What line is Lechmere on?
Green Line
Lechmere was the northern terminus of the Green Line until it closed for construction of the Green Line Extension project….Lechmere station.
Lechmere | |
---|---|
Location | Lechmere Square, East Cambridge, Massachusetts |
Coordinates | 42°22′15.3″N 71°04′39″WCoordinates: 42°22′15.3″N 71°04′39″W |
When was Lechmere station built?
July 10, 1922
Lechmere/Opened
Where is the green line going in Medford?
The project will extend the Green Line some 4.5 miles north along two branches, from Lechmere Station to Somerville’s Union Square and College Avenue in Medford. The entire project had to be pushed back five months.
Is Green Line extension on time?
Since awarding the $2.3 billion construction contract in 2017, the MBTA has consistently said the project would be completely finished by the end of 2021. The Green Line Extension has faced “schedule pressures” before, forcing builders to catch up after falling behind schedule.
What will happen to old Lechmere station?
Lechmere Station will be relocated to the north side of Monsignor O’Brien Highway in order to align the station will the remainder of the Green Line Extension. The new station will have two Headhouses, with one entrance at North First Street (Cambridge Crossing Street Network), and one entrance at East St.
When did Lechmere Sales Close?
November 7, 1997
Lechmere (/ˈliːtʃmɪər/ “leech-meer”) was a Massachusetts-based chain of retail stores that closed in 1997. At the time of its closing, it had 27 stores, including 20 in New England….Lechmere.
Industry | Retail |
---|---|
Founder | Abraham Cohen (c.1887–1977) |
Defunct | November 7, 1997 |
Fate | Liquidation |
Does the Green Line go to Cambridge?
The two branches split north of Lechmere, with the Union Square Branch following the MBTA Commuter Rail Fitchburg Line right of way to Union Square station in Somerville….Green Line Extension.
Green Line Extension (GLX) | |
---|---|
Locale | Cambridge, Somerville, and Medford, Massachusetts |
Termini | Union Square (D) Medford/Tufts (E) |
What is the Green Line extension project?
The Green Line Extension (GLX) project will extend the existing MBTA Green Line north from Lechmere Station to further service in Somerville, Cambridge, and Medford. The Medford Branch is scheduled for completion in May of 2022. …
Where does the Green Line go in Boston?
Green Line (MBTA)
Green Line | |
---|---|
Locale | Boston, Newton, East Cambridge and Brookline, Massachusetts |
Termini | East terminals: Park Street (B) North Station (C and E) Government Center (D) West terminals: Boston College (B) Cleveland Circle (C) Riverside (D) Heath Street (E) |
Stations | 66 (total) |
Service |
What electronic store went out of business?
Fry’s Electronics
Going, Going, Gone The latest to fall: California-based Fry’s Electronics, quirky competitor to Best Buy, which recently closed its doors for good. You may not realize how many other favorites have disappeared in recent years. Christine Clark and Jeff Rindskopf contributed to this report.
Does the T in Boston run 24 hours?
All routes operate 7 days a week, and they all stop near Boston Common, right downtown: Park Street. State Street. Government Center.