What does CtrlS company do?
CtrlS is a data center company in India headquartered in Hyderabad, Telangana. CtrlS sells services like data center colocation, DC build and consulting, Internet bandwidth, managed services, cloud security services, and disaster recovery services.
Who owns CtrlS?
Sridhar Pinnapureddy
One of them is Sridhar Pinnapureddy, Founder and Chairman of Rs 250-crore Tier-4 data centre company CtrlS Data Centre Limited. A lanky 42-year-old, Sridhar is a very shy person who does not reveal much about his past.
Is CtrlS a good company?
CtrlS wins Great Indian Workplace Award which recognizes the ‘Best Workplaces’ providing a congenial, caring, safe, enjoyable and trust based culture.
What is rated 4 data center?
Rated 4 datacenters are the safest place for your organization’s data and hardware as they are built to withstand earthquakes, floods, fires, and have several physical security zones.
What is PUE and how is IT calculated?
Having a facility that uses 100,000 kW of total power of which 80,000 kW is used to power your IT equipment, would generate a PUE of 1.25. The 100,000 kW of total facility power divided by the 80,000 kW of IT power. DCiE Example: The 80,000 kW of IT power divided by the 100,000 kW of total facility power.
What is a Tier 5 data center?
Tier 5 Platinum not only encompasses the resiliency and redundancy in other data center ratings systems, but also evaluates more than 30 additional key elements, such as long-term power system capabilities, the number of available carriers, zero roof penetrations, the location of cooling system lines in or above the …
How is PUE calculated?
PUE is determined by dividing the amount of power entering a data center by the power used to run the computer infrastructure within it. PUE is therefore expressed as a ratio, with overall efficiency improving as the quotient decreases toward 1.
What is a good PUE ratio?
1.0
PUE is the ratio of total amount of energy used by a computer data center facility to the energy delivered to computing equipment. PUE is the inverse of data center infrastructure efficiency (DCIE). An ideal PUE is 1.0.
Is Azure a Tier 4 data center?
From generation 1 the datacenters have been designed to meet the customer SLAs and service needs of 99,999%. Given that a tier 4 datacenter is designed towards a customer SLA and service need of 99,995%, we can state that an Azure Datacenter exceeds the expectations of a tier 4 datacenter.
What is a Tier 3 data center?
A Tier 3 data center is a location with redundant and dual-powered servers, storage, network links and other IT components. It is one of the most commonly used data center tiers, where IT components are powered with multiple, active and independent sources of power and cooling resources.
What is PUE value?
Power usage effectiveness (PUE) is a metric used to determine the energy efficiency of a data center. PUE is determined by dividing the amount of power entering a data center by the power used to run the computer infrastructure within it.
What’s a good PUE?
An ideal PUE is 1.0. Anything that isn’t considered a computing device in a data center (i.e. lighting, cooling, etc.) falls into the category of facility energy consumption.